Search
Close this search box.

knights Bridge, London

We did this job with our old company called (simply accurate)we were a contractor, and we took this job from the Sheldebouw/Permasteelisa group. Our duty involved: setting out base points on concrete slabs and steel for brackets installation. As-built surveys for concrete and steel structures. Transference of datums to each level. Monitor brackets and panel position. Teams one survey manager and four surveys team

Hotel Security - Fahrenheit Security
One-Hyde-Park-07
1200x800
Hotel Security - Fahrenheit Security One-Hyde-Park-07 1200x800
Scroll to Top